When a supplier price should change a manufacturing cost
A new supplier price has to land somewhere: on the product, on the next manufacturing order, or on orders already released. If nobody has chosen, the margin report will choose for you, late.
The offer is Odoo manufacturing. The operation is described on the manufacturing industry page.
Three different questions
A supplier price change is not one question. It is three, and Odoo answers each with a different setting. Confusing them is how a business discovers its margin after the invoice.
- Does the product's cost change when the purchase price changes?
- Do open manufacturing orders keep the cost they started with?
- Does the sales price of a made-to-order item follow the new material, or the quote already sent?
The answers depend on the costing method, the valuation setting and the timing of the purchase. They are design decisions, not defaults to leave for the first month-end.
Costing methods are options
Standard cost, average cost and FIFO answer different questions. Standard cost gives a stable number and a variance to explain. Average cost smooths the price across receipts. FIFO follows the actual layers of stock, which is more precise and more work to reconcile.
None of them is the right answer on a page that has not seen your products. A high-volume product with stable material may suit standard cost. A product whose material price moves every month may suit average cost. A business that must trace a batch may need FIFO for reasons that have nothing to do with margin.
The costs that arrive later
Landed cost, scrap and subcontract operations each move the cost again, and each needs a decision before the first works order. If freight and duty are allocated at the receipt, the product cost includes them. If they are expensed separately, the gross margin looks better than it is.
Scrap is the same. A bill of materials that assumes a perfect yield will understate the material cost of every order. Name the scrap percentage, who records it, and whether the standard cost includes it.
The variance report is the control
Whichever method you choose, someone has to read the difference between the cost the system expected and the cost it got. A standard cost that is never revised becomes fiction. An average cost that is never reconciled hides a bad purchase. The report is how the business learns that a supplier price moved before the margin does.
Put the report owner in the scope, with the frequency and the action. A report that nobody reads is a configuration, not a control.
One product family, one worked example
Bring one product family to the demo: the bill of materials, three months of purchase prices, one open works order and one customer order. Ask the partner to trace the material price from the purchase through the work order to the invoice, and to show what changes when the supplier price moves.
If the trace needs a spreadsheet, the design is not finished. If it works, you have a costing model you can explain to the person who signs the margin report. That is the test of the model, not the report.
What to write in the scope
- 01The costing method for each product family, and why.
- 02What a new supplier price changes, and what it leaves alone.
- 03How landed cost, scrap and subcontract are treated.
- 04Who can change a standard cost, and what approval is needed.
- 05Which report the commercial team reads, and when.
I sincerely hope this was helpful, and if you have any remark, suggestion or question, you can email me at louis@cdb.solutions or DM me on LinkedIn.
Thank you,
Clovis
Next step
See this in practice
Book a free demo. The technical partner for your country shows the apps that fit, at no charge.
Canonical URL: https://www.cdb.solutions/articles/manufacturing-material-costs
FAQ
Answers to the questions this article raises
The questions buyers ask most, answered here. If yours is not covered, ask us directly.
01Which costing method do you recommend?
02Can we change the costing method later?
Next step
Book a free demo
Tell us the country and the operation. The technical partner for your country shows Odoo against your process, at no charge.
+33 7 69 45 83 27UK with SofthealerEverywhere else with AppNvent
Free demo
Put this against your own operation
Country, industry and company size. The technical partner scopes the work and holds the agreement.
Country chooses the partner. The UK is implemented with Softhealer. Everywhere else, with AppNvent.
The demo is specific. Industry and company size tell the technical partner which apps to show you.
No charge, no obligation. Scoping and any agreement come later, and only if you want them.